Two Days, Eight Days or a Reasonable Time? Notice of Defect under TCC Art. 23(1)(c) and CISG Arts. 38–39

Between merchants, Turkish law sets a two-day and an eight-day notice period for defective goods.

Av. Onur ÇalışıcıPublished 9 September 2026 · 13 min read
Engraving: delivered boxes examined under a magnifying glass, with a red envelope and a small hourglass beside them and a Turkish tea set at the side.

In brief

  1. Article 23(1)(c) of the Turkish Commercial Code (Law No. 6102) requires a merchant buyer to notify a defect within two days if it is obvious on delivery, and to inspect within eight days and notify within that same period if it is not.
  2. The same subparagraph ends by sending every other case to Article 223(2) of the Turkish Code of Obligations (Law No. 6098), under which a defect that ordinary inspection could not reveal must be notified immediately once it comes to light.
  3. The CISG has been in force for Türkiye since 1 August 2011, and where it applies its Articles 38–39 displace the two-day and eight-day periods with a duty to examine within as short a period as is practicable and to give notice within a reasonable time.
  4. Under Article 39(2) CISG the buyer loses the right to rely on a non-conformity if it gives no notice within two years of actual handing over, unless that is inconsistent with a contractual guarantee period.
  5. The notice itself is not subject to a statutory form requirement, but the parties are free under Article 6 CISG to opt out of the Convention or to agree their own inspection and notice mechanics.

Where the CISG applies, Articles 38–39 replace them with a reasonable time. Which regime governs decides whether the claim survives.

A merchant buyer in Türkiye has two days to notify a defect that is obvious when the goods are delivered, and eight days to inspect and notify one that is not — those are the periods in Article 23(1)(c) of the Turkish Commercial Code (Law No. 6102). But if the contract falls within the United Nations Convention on Contracts for the International Sale of Goods, in force for Türkiye since 1 August 2011, those fixed periods do not apply at all: Articles 38 and 39 of the Convention require examination within as short a period as is practicable and notice within a reasonable time. Getting that threshold question wrong is how an otherwise good claim is lost.

The conflict matters because it is easy to miss. A German manufacturer and a Turkish distributor sign a supply agreement that says “governed by Turkish law”. A container arrives, the goods are wrong, and someone checks the Commercial Code, finds eight days, and panics. Or the reverse: everyone assumes the CISG’s “reasonable time” is generous, nobody moves for three weeks, and it turns out the parties had validly excluded the Convention. Both regimes are part of Turkish law. Which one governs is decided before the calendar starts running.

A box under a magnifying glass, with two hourglasses beside it, one very small and one medium-sized.
Which time limit governs notice of a defect is the starting question.

What Article 23(1)(c) of the Commercial Code actually says

Article 23 opens by confirming that, subject to its own special rules, the provisions of the Turkish Code of Obligations (Law No. 6098) on sale and barter also apply to sales between merchants. Subparagraph (c) then sets out the special rule on defects, and it has three limbs rather than the two most summaries give it.

First: where the goods are obviously defective at the time of delivery, the buyer must notify the seller of the situation within two days.

Second: where the defect is not obvious, the buyer is under a duty to inspect the goods, or have them inspected, within eight days of taking delivery, and — if that inspection reveals a defect — to notify the seller within that same period in order to preserve its rights. Note the structure: the eight days are an inspection window, and the notice must be given inside it. The clock does not restart when the inspection happens to be completed.

Third, and most often overlooked: the subparagraph closes by providing that in other cases, Article 223(2) of the Code of Obligations applies. That final sentence is the whole reason the two-day and eight-day periods are not the complete answer.

Article 223 of the Code of Obligations requires the buyer to examine the condition of the goods as soon as practicable in the ordinary course of business and, on seeing a defect for which the seller is responsible, to notify the seller within a suitable period. Its second paragraph then says that a buyer who neglects to examine and to notify is deemed to have accepted the goods — but immediately adds that this rule does not apply where the goods carry a defect that an ordinary examination could not have revealed. If such a defect is discovered later, it must be notified to the seller at once; if it is not, the goods are deemed accepted with that defect.

So the architecture is: obvious defect, two days. Defect discoverable on a proper inspection, eight days. Defect that no ordinary inspection could have caught, immediate notice on discovery — and no fixed head start. Article 223(2) of the Code of Obligations draws the same line: the deemed-acceptance rule does not apply to a defect that an ordinary examination could not reveal, and such a defect must be notified immediately once it comes to light. The inspection burden therefore attaches only to what an ordinary examination would reveal.

The eight-day trap that is not about defects

Turkish commercial practice contains a second eight-day rule, and the two are regularly conflated. Article 21(2) of the Commercial Code provides that a person who receives an invoice and does not object to its content within eight days of receipt is deemed to have accepted that content. Article 21(3) applies the same eight days to letters of confirmation for contracts concluded by telephone or other communication tools.

Those provisions concern the invoice or the confirmation letter, not the physical quality of the goods. A buyer who lets an invoice go unchallenged has accepted what the invoice says; that is a separate exposure from the defect regime, and it is a common route to unpleasant surprises for foreign parties dealing under Turkish commercial contracts for the first time.

Three different clocks in Turkish commercial sales
ProvisionWhat it governsPeriodConsequence of silence
TCC Art. 23(1)(c), first limbDefect obvious at delivery2 days from deliveryBuyer cannot rely on the defect
TCC Art. 23(1)(c), second limbDefect found on inspection8 days from delivery, to inspect and notifyBuyer cannot rely on the defect
TCO Art. 223(2)Defect ordinary inspection could not revealImmediately on discoveryGoods deemed accepted with the defect
TCC Art. 21(2)Content of an invoice received8 days from receiptContent of the invoice deemed accepted

When the CISG takes over

Türkiye’s route into the Convention has two dates that are frequently merged into one. Parliament approved accession by Law No. 5870 of 2 April 2009, published in the Official Gazette of 14 April 2009. Accession was then decided by Council of Ministers Decision No. 2010/247, published in the Official Gazette of 7 April 2010, No. 27545. Türkiye deposited its instrument of accession on 7 July 2010, and under Article 99(2) of the Convention — which brings the treaty into force for an acceding State on the first day of the month following the expiry of twelve months from deposit — the CISG entered into force for Türkiye on 1 August 2011. Türkiye acceded without reservations, and Article 98 of the Convention permits none beyond those it expressly authorises.

A red crate examined with a magnifying glass, an envelope with a dashed arrow towards a loaded cargo ship, and a red-bound book standing between them.
In an international sale, the convention's rules on notice of defect can take over.

Once in force, the Convention is part of Turkish law. Article 1(2) of the International Private and Procedure Law (Law No. 5718) reserves the provisions of international conventions to which Türkiye is a party; Article 24 of the same Law, which lets the parties choose the governing law expressly or by terms leaving no room for doubt, and otherwise applies the law most closely connected with the contract, operates behind that reservation rather than over it.

The practical consequence is uncomfortable for anyone who drafted quickly. A clause reading “this agreement is governed by the laws of the Republic of Türkiye” does not exclude the Convention, because the Convention is part of those laws for contracts within its scope. Excluding it requires the deliberate step Article 6 permits: the parties may exclude the Convention’s application altogether or, subject to Article 12, derogate from or vary the effect of its provisions.

Articles 38 and 39 compared with the domestic regime

Article 38(1) obliges the buyer to examine the goods, or have them examined, within as short a period as is practicable in the circumstances. Where the contract involves carriage, Article 38(2) allows examination to be deferred until the goods have arrived at their destination, and Article 38(3) defers it further where goods are redirected or redispatched in transit without a reasonable opportunity for examination and the seller knew or ought to have known of that possibility.

Article 39(1) then provides that the buyer loses the right to rely on a lack of conformity if it does not give notice to the seller specifying the nature of the lack of conformity within a reasonable time after it discovered it or ought to have discovered it. Article 39(2) adds a long-stop: in any event, the buyer loses that right if it does not give notice within two years of the date on which the goods were actually handed over, unless that time limit is inconsistent with a contractual period of guarantee.

Two escape valves follow. Article 40 stops the seller relying on Articles 38 and 39 at all where the non-conformity relates to facts of which it knew or could not have been unaware and which it did not disclose. Article 44 allows a buyer with a reasonable excuse for its failure to notify to reduce the price under Article 50 or to claim damages other than loss of profit — but not to avoid the contract or demand substitute goods.

Domestic commercial sale compared with a CISG sale
IssueTCC Art. 23(1)(c) / TCO Art. 223CISG Arts. 38–39
Duty to examineWithin 8 days of delivery where the defect is not obviousWithin as short a period as is practicable; deferrable where carriage is involved
Notice period2 days (obvious) or within the 8-day window; immediately for latent defectsReasonable time after discovery or the moment it ought to have been discovered
Content of the noticeThe defects must be identified concretely, not reserved in general termsMust specify the nature of the lack of conformity
Outer limitAction barred 2 years after delivery (TCO Art. 231), with exceptionsNotice barred 2 years after actual handing over, unless inconsistent with a guarantee period
Seller's knowledgeGross fault defeats the time-bar argument (TCO Art. 225)Art. 40 removes reliance on Arts. 38–39 entirely
Party autonomyContractual inspection protocols are common; TCO Art. 221 voids exclusion clauses where the seller is grossly at faultArt. 6 allows exclusion or variation, subject to Art. 12

What the notice must contain

Neither regime prescribes a form for the notice of defect itself, but content matters. Article 223(1) of the Code of Obligations requires the buyer to notify the seller of the defect it has found in the goods, so the subject of the notice is the defect itself. The notice should communicate the defects identified in concrete terms and make clear that the goods are not accepted in that condition. A general reservation of rights entered on a delivery record (the familiar “all claims for delay, shortage, damage, defects and latent defects reserved”) points to no defect at all and may therefore not do that job; the safe course is to set out the defects found one by one. The statute does not demand forensic precision either: what matters is that the buyer’s intention to give notice of defect, and the subject matter of the complaint, can be identified.

Practically, that means a notice should establish the contract and consignment it concerns, the delivery date, the inspection carried out and when, each defect found described specifically enough for the seller to investigate, an express statement that the goods are not accepted in that condition, and — kept separate — the remedy the buyer intends to claim. Article 227 of the Code of Obligations gives the buyer a choice between rescinding the contract by declaring that it is ready to return the goods, keeping the goods and demanding a reduction of the price in proportion to the defect, demanding free repair at the seller’s cost where that does not require excessive expense, and demanding substitute goods free of the defect where that is possible, with damages under the general rules reserved.

The separation of the two steps matters because of a form requirement that catches foreign parties out. Article 18(3) of the Commercial Code requires notices and warnings between merchants that serve to put the other party in default, to terminate the contract or to rescind it to be made through a notary, by registered letter, by telegram, or via the registered electronic mail system using a secure electronic signature. A notice of defect is not on that list. A subsequent declaration of rescission is. Sending the defect notice by email and then rescinding by the same email is a sequence worth avoiding.

Article 18(2) sits behind all of this: every merchant must act in all its commercial activities as a prudent businessperson. That standard is what turns a short statutory period into a real risk. A buyer who lets goods sit at a bonded warehouse for a fortnight before anyone looks at them will find the standard applied against it — a consideration that also arises when goods are held up in customs, which is why inspection planning belongs in the same conversation as import clearance.

Limitation, and what survives a missed notice

Missing the notice period and running out of limitation time are different failures. Article 231 of the Code of Obligations provides that, unless the seller has assumed liability for a longer period, every action arising from liability for defects in the goods is time-barred two years after the goods are transferred to the buyer, even if the defect emerges later. The same provision then preserves something: the buyer’s defence based on a defect notified within those two years does not lapse when the period expires. A buyer who notified in time but was slow to sue may still be able to resist a claim for the price even after the two years have run. Article 231(2) removes the two-year protection altogether from a seller who is grossly at fault in delivering defective goods.

Where the relationship is a continuing supply or distribution arrangement rather than a one-off sale, a defect dispute rarely stays contained. It tends to surface alongside termination and indemnity questions of the sort discussed in our note on terminating a Turkish distributorship, and the two-day and eight-day periods will apply to each individual delivery under the framework agreement unless the parties have agreed otherwise. Where the dispute does escalate, the notice file is usually the first thing examined in commercial litigation and arbitration — which is an argument for treating inspection records as a contract-management task rather than a legal one.

Drafting round the problem

The cleanest fix is to decide the regime in the contract rather than discover it in a dispute. Under Article 6 CISG the parties can exclude the Convention or vary its provisions, and under general Turkish sales law they can agree their own inspection and notice mechanics — within the limits of Article 221 of the Code of Obligations, which voids any agreement excluding or limiting liability for defects where the seller is grossly at fault in delivering defective goods, and Article 222(2), under which the seller answers for defects the buyer could have seen on an adequate examination only if it separately warranted their absence.

Four clauses do most of the work: an explicit statement whether the CISG applies or is excluded; a defined inspection window with a defined starting event, such as arrival at the buyer’s warehouse rather than at the port; an agreed notice channel and address, with the recipient named; and a specified guarantee period, which under Article 39(2) CISG can displace the two-year long-stop where the two are inconsistent. These belong in the same review as the governing-law and dispute-resolution clauses, and are part of what a general review under Turkish commercial law should be checking.

None of this is exotic drafting. It is simply the recognition that a Turkish sale can run on two entirely different clocks, and that the party which has not decided which one applies is the party that finds out too late.

Key figures

2 days
Notice period for a defect obvious on delivery, TCC Art. 23(1)(c)
8 days
Inspection and notice period for a defect not obvious on delivery
1 Aug 2011
Date the CISG entered into force for Türkiye
2 years
Long-stop notice period under Art. 39(2) CISG

Handling a defective delivery between merchants

  1. Fix the applicable regime first

    Decide whether the contract falls within the CISG or is governed by the Commercial Code and Code of Obligations, because the two set very different clocks.

  2. Date the delivery precisely

    Record when the goods were actually handed over, since both the two-day and eight-day periods and the CISG two-year long-stop run from that moment.

  3. Inspect and document

    Carry out or commission the inspection within the applicable period and preserve the findings, photographs and any third-party inspection report.

  4. Give a specific notice

    Identify the goods, the consignment, each defect found and state that the goods are not accepted in that condition — a general reservation of rights is not enough.

  5. Elect a remedy separately

    Choose between rescission, price reduction, repair or substitute goods, and observe the form requirements that apply to a rescission notice between merchants.

  6. Watch the limitation period

    Turkish domestic law bars actions for defects two years after the goods are delivered, subject to the exceptions in the Code of Obligations.

Frequently asked questions

How long does a merchant buyer in Türkiye have to notify a defect?

Under Article 23(1)(c) of the Turkish Commercial Code (Law No. 6102), if the goods are obviously defective at the time of delivery the buyer must notify the seller within two days. If the defect is not obvious, the buyer must inspect the goods, or have them inspected, within eight days of taking delivery and must notify the seller within that same eight-day period if the inspection reveals a defect. Those two periods are short by international standards, and they run from delivery rather than from the moment the buyer's technical team gets round to the goods. The subparagraph then adds that in other cases Article 223(2) of the Turkish Code of Obligations applies, which is where defects that no ordinary inspection could have revealed are dealt with.

What happens to a defect that only appears months later?

It falls outside the two-day and eight-day periods. Article 23(1)(c) of the Commercial Code expressly refers other cases to Article 223(2) of the Code of Obligations. That provision states that a buyer who neglects to inspect and to notify is deemed to have accepted the goods, but then says this does not apply where the goods carry a defect that ordinary inspection could not have revealed. If such a defect emerges later, it must be notified to the seller immediately; if it is not, the goods are deemed accepted with that defect. So a latent defect does not extend the eight-day window indefinitely — it replaces it with a duty to act at once on discovery.

Does the CISG apply to my contract with a Turkish supplier or buyer?

The Convention has been in force for Türkiye since 1 August 2011. Under Article 1(1) it applies to contracts of sale of goods between parties whose places of business are in different States, where those States are Contracting States, or where the rules of private international law lead to the law of a Contracting State. Article 1(3) makes clear that neither the nationality of the parties nor whether they are merchants nor whether the contract is civil or commercial matters. Article 2 excludes certain sales — sales by auction, sales on execution or otherwise by authority of law, securities and money, ships, vessels, hovercraft and aircraft, and electricity, and goods bought for personal, family or household use, this last exclusion itself falling away where the seller neither knew nor ought to have known that the goods were bought for such use — and Article 3(2) excludes contracts where the supplying party's obligation consists preponderantly in the supply of labour or other services.

Can we contract out of the CISG and keep the Turkish Commercial Code periods?

Yes. Article 6 of the Convention allows the parties to exclude its application, and — subject to Article 12 — to derogate from or vary the effect of any of its provisions. An exclusion needs to be drafted deliberately: a clause that simply says the contract is governed by Turkish law does not by itself exclude the Convention, because the CISG forms part of Turkish law for contracts within its scope. Article 1(2) of the International Private and Procedure Law (Law No. 5718) reserves the provisions of international conventions to which Türkiye is a party. Parties who want the two-day and eight-day regime, or a bespoke inspection protocol, need to say so in terms.

Is there a form requirement for the notice between merchants?

The notice of defect itself is not among the communications for which the Commercial Code prescribes a form. Article 18(3) of Law No. 6102 requires notices between merchants that serve to put the other party in default, to terminate the contract or to rescind it to be given through a notary, by registered letter, by telegram or through the registered electronic mail system using a secure electronic signature. A notice of defect is not on that list — but the buyer's later declaration that it is rescinding the contract is, so the two steps should not be treated as one. What matters is content and proof rather than channel: because Article 223(1) of the Code of Obligations requires the buyer to notify the seller of the defect it has found, the notice should identify the defects concretely, and a general reservation of rights that points to no defect at all may not discharge that burden.

What if the seller knew about the defect?

Both regimes take that away from the seller. Article 40 of the CISG provides that the seller cannot rely on Articles 38 and 39 if the lack of conformity relates to facts of which it knew or could not have been unaware and which it did not disclose to the buyer. Turkish domestic law reaches the same place from a different direction: under Article 225 of the Code of Obligations, a seller who is grossly at fault cannot escape liability, even in part, by arguing that the defect was not notified in time — and the same rule applies to defects that persons who make selling their profession ought to know about. Article 221 goes further and makes any agreement excluding or limiting liability for defects absolutely void where the seller is grossly at fault in delivering defective goods.

Does a late notice destroy the claim entirely under the CISG?

Not always. Article 44 gives the buyer a narrow escape: if the buyer has a reasonable excuse for its failure to give the required notice, it may still reduce the price under Article 50 or claim damages, except for loss of profit. That is a partial rescue, not a restoration — the buyer who relies on Article 44 does not recover the right to avoid the contract or to demand substitute goods. Article 39(2) also sets an outer limit: notice given more than two years after the goods were actually handed over comes too late, unless that time limit is inconsistent with a contractual period of guarantee.

This guide is general information, not legal advice. For advice on your specific situation, speak with a lawyer. Prepared by Lex Lata Consulting & Law.

Av. Onur Çalışıcı

About the author

Av. Onur Çalışıcı

Founding Attorney · Istanbul Bar Association · Bar reg. no 83426

Lex lata is Latin for “the law as it is”. The office was founded by Av. Onur Çalışıcı, and you deal with Av. Çalışıcı directly from the first meeting to the end of the matter. With foreign clients we write in English and explain what each Turkish document says.

Tell us briefly what happened and we will get back to you. This guide is general information, not advice on your case.

Last reviewed: September 2026 · LinkedIn: linkedin.com/in/onurcalisici

OfficeKarataş Sk. No:6, SNS Plaza Kat:3, Kağıthane, Istanbul

On screen

Beyaz TV · Beyaz Ana Haber · September 2026 · In Turkish

Evicting a tenant who disturbs the neighbours

Why a tenant's unbearable conduct has to be shown with concrete evidence, and the exceptional cases in which the 30-day period may not be required.

Related insights & legal guides

  1. The Turkish Commercial Code (Law No. 6102) Explained: Structure, Company Types and the Rules Behind Shareholder Disputes
  2. Buying a Turkish Apartment Without an Occupancy Permit: Which Transactions Are Blocked (Zoning Act Arts. 30–31)
  3. Joint Ventures as an Ordinary Partnership in Türkiye: Contributions, Management, Liability and Exit (TCO 620-645)
  4. Board Member Liability, Discharge and Derivative Claims in Turkish Joint Stock Companies
  5. Signing a Power of Attorney in the UK for Use in Türkiye: Turkish Consulate, UK Notary and the FCDO Apostille
  6. Heirs in Germany and Property in Turkey: The 1929 Estate Rules, the Erbschein and the Turkish Certificate of Inheritance
  7. Signing a Power of Attorney in Germany for Use in Türkiye: Turkish Consulate or German Notary and Apostille
  8. Power of Attorney and Apostille from the US for Use in Türkiye: Which Route for Which Matter
  9. Power of Attorney and Apostille from Canada for Türkiye: Turkish Consulate or Canadian Notary
  10. When a 120-Day Payment Term Is Void: TCC Art. 1530(5)–(7) and the Gross Unfairness Test

All guides

Practice areas

Office and events

Gürsel Mah., Karataş Sk. No:6, SNS Plaza Kat:3, Kağıthane / İstanbul · Address and directions

The Lex Lata office in Kağıthane, Istanbul: desks and wall screens showing the Lex Lata logo
The office · Kağıthane, Istanbul
Av. Onur Çalışıcı on the blockchain law panel at Blockchain Expo World, Istanbul, July 2024
Blockchain law panel · Blockchain Expo World, Istanbul · July 2024
A meeting around the table in the Lex Lata meeting room
Meeting room · Kağıthane, Istanbul

SNS Plaza, Kağıthane, IstanbulContact page